• Gainn4Mos
    • About
    • Studies&Prototypes
    • Partners
    • Private Area
  • Gainn4Ship Innovation
    • About
    • Study&Prototype
    • Partners
    • Private Area
  • Gainn4Core
    • About
    • Activities
    • Partners
    • Private Area
  • News&Events
    • News
    • Events
  • Dissemination
  • Brochures
  • Executive Summaries
  • Videos



Captura de pantalla 2018-10-30 a las 16.43.12

Reducing emissions from high-speed vessels: technology developed and future challenges

View PDF Download
Captura de pantalla 2018-11-08 a las 11.44.07

Engineering Report of the: “Additional truck/ISO-containers loading capacity in Fos Tonkin and Fos Cavaou”

View PDF Download
Captura de pantalla 2018-11-08 a las 11.41.59

Engineering Report of the: “Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Tonkin”

View PDF Download
Captura de pantalla 2018-11-08 a las 11.38.44

Engineering Report of the: “Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Fos Cavou”

View PDF Download
Captura de pantalla 2018-10-30 a las 16.43.12

Reducing emissions from high-speed vessels: technology developed and future challenges

View PDF Download
Captura de pantalla 2018-10-26 a las 13.50.19

Engineering Report of the: “LNG truck loading facility of the Montoir de Bretagne”

View PDF Download
Captura de pantalla 2018-10-26 a las 13.47.11

Engineering Report of the: “Adaptation of jetties and LNG transfer facilities for loading of bunker vessels in Nantes-Saint Nazaire”

View PDF Download
Captura de pantalla 2018-10-05 a las 14.33.50

Engineering Report of the prototype: “LNG Bunkering Barge”

View PDF Download
Captura de pantalla 2018-10-05 a las 14.31.26

Studies for the LNG bunkering station for road transport and maritime transport in Luka Koper. ”Basic Engineering Study of the LNG Refuelling Station in Koper

View PDF Download
  • «
  • 1
  • 2
  • »



  • Gainn4Mos
  • Gainn4Ship Innovation
  • Gainn4Core
  • News&Events
  • Dissemination
  • Contact

Coordination and Communication:

Phone: +34 96 393 94 00
www.fundacion.valenciaport.com

© Copyright 2021 - GAINN. All rights reserved

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish.Accept Read More
Privacy & Cookies Policy