Activity 2: Engineering projects of prototypes

Description

The aim of the activity is to conclude engineering studies on the Core Ports concerned by the Action.

The activity concerns the design of the best engineering solutions to fulfil the required local conditions taking into account local legislation (e.g. port procedures) as well as best practices, taking into account the results of past and ongoing co-funded actions  and the ongoing work with the Italian Administration on the National Policy Framework set out by Directive 2014/94.

The studies covered:

  • the LNG storage and local distribution (C2), the LNG ship bunkering (C3) and the LNG non-ship vehicle refuelling (C4) in the Port of Genova;
  • the LNG ship bunkering (C3) and the LNG non-ship vehicle refuelling (C4) in the Port of La Spezia;
  • the LNG storage and local distribution (C2), the LNG ship bunkering (C3) and the LNG non-ship vehicle refuelling (C4) in the Port of Livorno;
  • the LNG receiving system (C1), the LNG storage and local distribution (C2), the LNG ship bunkering (C3) and the LNG non-ship vehicle refuelling (C4) in the Port of Ravenna;
  • the LNG storage and local distribution (C2) in the Port of Venice;

Activity 2 timeframe: 01/06/2015 – 31/12/2016