Description
The aim of Activity 4 is to test and validate the LNG pilot grids trough real life trials on the prototypes to be realized in Activity 3.
Activity 4 timeframe: 01/01/2018 – 31/05/2019
The aim of Activity 4 is to test and validate the LNG pilot grids trough real life trials on the prototypes to be realized in Activity 3.
Activity 4 timeframe: 01/01/2018 – 31/05/2019
© Copyright 2022 - GAINN. All rights reserved